We use cookies on our website to see how you interact with it. By accepting, you agree to our privacy policy and the use of such cookies.
INDUSTRY
Underground mine, South America
IMPACT
Unit cost, burden spacing, drilling/explosives consumption
OVERALL EFFECT
Unit operating cost down up to 8.6% (at 1.25m burden); projected annual saving ~USD 300,000.
INDUSTRY
Open Pit Mine, South Africa
IMPACT
PPV compliance, monitoring, process
OVERALL EFFECT
Full proximity-blasting lifecycle keeping PPV, noise and airblast below DMPR legal limits.
UNISA RESEARCH
INDUSTRY
Quarry, South Africa
IMPACT
Airblast/air overpressure, regulatory compliance
OVERALL EFFECT
Airblast sample mean reduced 9.35% (Station A) and 9.08% (Station B); 134 dB exceedances cut from 67% to 33% (A) and 25% to 0% (B).
Across 27 blasts (15 with Varistem® BP4 plugs, 12 standard), the plugs cut the airblast pressure wave that affects nearby structures. Far fewer Varistem® blasts exceeded the 134 dB limit, with the reduction confirmed at 95% confidence.
Mushwana, 2025 · UNISA
INDUSTRY
Copper mine, Africa
IMPACT
Velocity of Detonation (VoD), fragmentation
OVERALL EFFECT
VoD of holes with Varistem® plugs was 10.9% higher than those without.
INDUSTRY
Iron ore mine
IMPACT
Fragmentation, charge mass/powder factor, QA/QC
OVERALL EFFECT
A measured in-field diameter of 142mm vs the 127mm bit (≈+15%) drove charge mass per metre up ~25% and lifted powder factor by an estimated ~35%, explaining the oversize and poor fragmentation.
INDUSTRY
Gold mine, West Africa
IMPACT
Fragmentation, loader productivity, cost-neutrality, and environmental impact
OVERALL EFFECT
D80 6.61% finer; loader productivity +8.7% (PC2000); achieved at net-zero cost.
INDUSTRY
Mining, quarrying, construction
IMPACT
Wall stability, overbreak control, slope integrity
OVERALL EFFECT
A practical design-and-audit framework for pre-splits that protect final walls from overbreak and blast damage.
INDUSTRY
Mines & quarries
IMPACT
Airblast, noise, air overpressure, monitoring & compliance
OVERALL EFFECT
A technical reference on what generates blast airblast and how to measure, predict and control it.
INDUSTRY
Underground platinum mine, South Africa
IMPACT
Advance per blast, profitability
OVERALL EFFECT
Advance per blast up 11% (2.46m to 2.82m); net value ~R58,000 per panel per blast. Financial improvement of R 1.91 billion.
INDUSTRY
Coal mine, South Africa
IMPACT
Flyrock, safety, energy retention
OVERALL EFFECT
Despite an average SDoB (0.53) predicting violent flyrock, throw stayed within ~100 m; behaviour was a controlled "heave," not flyrock.